TransCanada Keystone Pipeline Install of 7 Pump Stations & 4 Meter Stations
Owner: | TransCanada Pipelines |
Trades: | Electrical, Instrumentation |
Date: | February 2010 |
Project Description and Scope:
The State Group supplied and installed the electrical and instrumentation services on seven (7) Greenfield pump stations, two metering stations and 14 mainline valves for Phase one of the TCPL Keystone Pipeline.
Total connected capacity 105,000HP with future capacity of 70,000HP.