TD Bank

vector-image

SOC Resiliency Upgrades

Significant upgrades were made to the power distribution systems as well as major installations to enhance resiliency.

  • Location:Scarborough, ON
  • Trades:Electrical
  • Date:May 2015
vector-image

Scope of work and outcome

The State Group scope of work included the resiliency upgrades of the existing Critical Power Distribution system, including the installation of a Generator, a Transformer, Switchgears, Automatic Transfer Switches, UPS System and Batteries, SSTTS static Transfer Switches, UPS Output Switchboards, and Bus‐Duct. The State Group also completed the upgrades to the Existing Generator controls, HV Monitoring and CMS modifications.

All work was completed and fully commissioned without interruption to the critical operation of the facility.

Related Projects

Compression Engine Installation for TC Energy

York University

Fiber-Optic communications cabling & infrastructure upgrades.

Alcoa Warrick Operations

Ongoing civil, electrical, HVAC, ironwork, piping, and millwrighting services since 2000.