TD SOC Resiliency Upgrades
Owner: | TD Bank |
Trades: | Electrical |
Date: | May 2015 |
Project Description and Scope:
The State Group scope of work included the resiliency upgrades of the existing Critical Power Distribution system, including the installation of a Generator, a Transformer, Switchgears, Automatic Transfer Switches, UPS System and Batteries, SSTTS static Transfer Switches, UPS Output Switchboards, and Bus‐Duct. The State Group also completed the upgrades to the Existing Generator controls, HV Monitoring and CMS modifications.
All work was completed and fully commissioned without interruption to the critical operation of the facility.