When you choose The State Group for your oil and gas facility’s installation or maintenance project, you have access to all the qualified expertise and personnel you need to complete the job on-time, on-budget and with 100% compliance to safety and regulations. On these criteria, our in-house team of experts has built a solid reputation for providing electrical, instrumentation and steel fabrication services to the oil and gas industry. Our capabilities span the full spectrum from daily service and maintenance to comprehensive turnkey solutions for the installation of greenfield Pumping, Compression, Metering, and Storage stations. Our work is backed by full compliance with all regulatory requirements and you can have confidence in knowing that your project will be completed by fully licensed technicians across both Canada and the U.S.

Our portfolio of successful projects amounts to more than 700,000 horse power connected for an aggregate value in excess of $100 million. You can view some of those rewarding projects in the case studies on this page, or contact us to learn more about our experience which encompasses the following:

  • 12 Greenfield Compressor Stations = 220,000 HP connected
  • 7 compressor station HP additions = 55,000 HP connected
  • 34 Greenfeild Pump Stations = 380,000 HP connected
  • 7 pump station HP additions = 45,000 HP connected
  • 60 meter stations
  • 14 tankfarm installations/retrofits
Case Studies
Manifold at Enbridge Tank Farm
The State Group was involved in the Refurbishment of 7 bulk storage tanks with new SAAB Radar gauging and new 5KV distribution racks.
TransCanada Station 130 Update Project
The TransCanada Station 130 Update Project was the complete construction of a $25 million new Natural Gas Compression facility which included the installation of (2) Solar MARS gas compressors for the existing Station 130 Plant in Toronto, Ontario.
TCPL Keystone PipelineInstall of 7 Pump Stations & 4 Meter Stations
The State Group supplied and installed the electrical and instrumentation services on seven Greenfield pump stations, two metering stations and 14 mainline valves for phase one of the TCPL Keystone Pipeline.

 
 
           
  ABOUT STATE
Company Profile
What Our Clients Say About State
Our Commitment to Safety
Our Commitment to Quality
Purchasing Terms & Conditions
Affiliations & Awards
News
  CAPABILITIES
Civil
Electrical
High Voltage
Mechanical
HVAC
Communications

  MARKETS WE SERVE
Automotive
Steel/Metals
Power Generation
Oil and Gas
Mining
Mission Critical Facilities
Transportation and Infrastructure
Commercial/Institutional
Power/High Voltage
     CAREERS
CONTACT
LOCATIONS
CASE STUDIES