No. 3 Temper Mill Project is new Stand Alone 4 Hi Non Reversing Skin Pass Mill facility located in Hamilton, Ontario. Project has a contract value of approximately $12,000,000. State safely performed over 100,000 skilled trade hours of all trades including the managment of HVAC equipment, cladding and painting sub-contractors.

Project installation commenced November 2013 and with a construction completion date of July, 2014, and the first production coil produced in September 2014.

Scope of work included the procurement of piping systems, electrical, structural components, the installation of mechanical and electrical equipment which included for the entry side equipment (loading), entry area equipment for storage and transporting coils for the entry side equipment to the mill (process), The final section is for inspection equipment and Exit Coil (Delivery) equipment.

The new Temper Mill replaces two existing mills and was part of ArcelorMittal Dofasco`s Finishing Optimization Project.

On completion the Temper Mill is capable of processing high yield and tensile strength products of varying thicknesses and surface texture of the steel and the mill is designed to produce 742,000 tons per annum.

 
 
           
  ABOUT STATE
Company Profile
What Our Clients Say About State
Our Commitment to Safety
Our Commitment to Quality
Purchasing Terms & Conditions
Affiliations & Awards
News
  CAPABILITIES
Civil
Electrical
High Voltage
Mechanical
HVAC
Communications

  MARKETS WE SERVE
Automotive
Steel/Metals
Power Generation
Oil and Gas
Mining
Mission Critical Facilities
Transportation and Infrastructure
Commercial/Institutional
Power/High Voltage
     CAREERS
CONTACT
LOCATIONS
CASE STUDIES