ST. JOHN'S REHABILITATION HOSPITAL
LOCATION:     Toronto, ON
CLIENT: Buttcon Construction
VALUE: $15,000,000
TRADES: Multi-trade
DATE: December 2012
      
PROJECT DESCRIPTION:
The project included installation of new FA system throughout the existing facility, amalgamated with the East Wing. A new security system was installed throughout the existing facility and new wing along with a new electrical service comprising of new H/V gear, power transformers, L/V switchboard to feed the entire facility, and a new generator to feed the East Wing with a complex ATS and Kirk key scheme to allow the system to be fed from the two generators. The transfer from existing to new electrical service was accomplished by placing the entire existing facility on a mobile generator to keep the facility in operation while the East Wing was under construction.
The State Group Inc. was contracted by Buttcon Construction Ltd. to perform the Electrical and Mechanical Installation for this project. The project consisted of the East Wing which housed a rehabilitation complex with treatment gyms, training areas and a new therapy pool. The Phase 2 work consisted of a complete renovation of the lower level and the subsequent FA retrofit of the existing 4 upper floors of this Wing.

For more information about State Group Inc. and its contracting services, please call 800.558.2034 or email us at info@stategroup.com
 
 
 
           
  ABOUT STATE
Company Profile
What Our Clients Say About State
Our Commitment to Safety
Our Commitment to Quality
Purchasing Terms & Conditions
Affiliations & Awards
News
  CAPABILITIES
Civil
Electrical
High Voltage
Mechanical
HVAC
Communications

  MARKETS WE SERVE
Automotive
Steel/Metals
Power Generation
Oil and Gas
Mining
Mission Critical Facilities
Transportation and Infrastructure
Commercial/Institutional
Power/High Voltage
     CAREERS
CONTACT
LOCATIONS
CASE STUDIES