  CASE STUDIES:
NEPCO 540MW PEAKING POWER PLANT
LOCATION:     Gleason, IN
CLIENT: Nepco
VALUE: $10,900,000
TRADES: Multi-trade
DATE: June 2000
       
PROJECT DESCRIPTION:
This project involved the installation of 3 - 180 MW Westinghouse 501F Gas Turbine/Generators with all supporting facilities. 1 unit had a Hydrogen Cooled Generator, and the other 2 units were newly designed 501FD Gas Turbines with Airopac Generators. All three generators had Evaporative Cooling and Demin Water Injection to reduce emissions. Power was tied into a TVA 400 KV Main Grid.
The State Group Inc. performed all civil foundation installations, all electrical work and all mechanical and piping installations.
The contract was on a cost reimbursable basis and employed labor from the local building trades.

Approximately 300,000 man hours were spent, with a peak of approximately 280 State tradesmen.

The start date on this project was November 1999 and was completed in June 2000, 6 weeks ahead of schedule despite a 5 week late start.

This site is located in NW Tennessee.

For more information about State Group Inc. and its contracting services, please call 800.558.2034 or email us at info@stategroup.com
 
 
 
           
  ABOUT STATE
Company Profile
What Our Clients Say About State
Our Commitment to Safety
Our Commitment to Quality
Purchasing Terms & Conditions
Affiliations & Awards
News
  CAPABILITIES
Civil
Electrical
High Voltage
Mechanical
HVAC
Communications

  MARKETS WE SERVE
Automotive
Steel/Metals
Power Generation
Oil and Gas
Mining
Mission Critical Facilities
Transportation and Infrastructure
Commercial/Institutional
Power/High Voltage
     CAREERS
CONTACT
LOCATIONS
CASE STUDIES