800.558.2034
Facebook Twitter LinkedIn FRANÇAIS
 
  CASE STUDIES:
TCPL KEYSTONE PIPELINE INSTALL OF 7 PUMP STATIONS & 4 METER STATIONS
LOCATION:     Illinois/Missouri
PRIME: Jones Blythe
CLIENT: TCPL
VALUE: $14,250,000
TRADES: Electrical
Instrumentation
DATE: February 2010
       
PROJECT DESCRIPTION:
The State Group supplied and installed the electrical and instrumentation services on seven Greenfield pump stations, two metering stations and 14 mainline valves for phase one of the TCPL Keystone Pipeline.
The State Group Inc. supplied and installed the electrical and instrumentation services on seven Greenfield pump stations, two metering stations and 14 mainline valves for phase one of the TCPL Keystone Pipeline.
Total connected capacity 105,000HP with future capacity of 70,000HP.

For more information about State Group Inc. and its contracting services, please call 800.558.2034 or email us at info@stategroup.com
 
 
 
           
  ABOUT STATE
Company Profile
What Our Clients Say About State
Our Commitment to Safety
Our Commitment to Quality
Purchasing Terms & Conditions
Affiliations & Awards
News
  CAPABILITIES
Civil
Electrical
High Voltage
Mechanical
HVAC
Communications

  MARKETS WE SERVE
Automotive
Steel/Metals
Power Generation
Oil and Gas
Mining
Mission Critical Facilities
Transportation and Infrastructure
Commercial/Institutional
Power/High Voltage
     CAREERS
CONTACT
LOCATIONS
CASE STUDIES