800.558.2034
Facebook Twitter LinkedIn FRANÇAIS
 
  CASE STUDIES:
DOFASCO FDIP NO. 2 CPCM NEW PICKLE LINE PROJECT
LOCATION:     Hamilton, ON
CLIENT: Dofasco
VALUE: $19,500,000
TRADES: Millwrighting
Ironwork
DATE: February 2006
       
PROJECT DESCRIPTION:
Dofasco No. 2 CPCM project was comprised of two construction projects which resulted in the coupling of a new facility (No. 6 Pickle Line) to an existing facility (No. 2 Tandem Cold Mill).
The State Group Inc.`s responsibility was to manage 240,000 direct man-hours on a contract value of $19.5 Million for Millwrighting and Ironwork. This entailed the installation of Coil Handling Walking Beam equipment, Scrap Handling Equipment, Pay-Off Reel equipment, Laser Welder, series of Bridles and Steering units, Tension Leveler, Helical Turners, Horizontal (four) Loopers, Acid Tanks, Side Trimmer and Vertical Turning Towers. The TCM upgrade consisted in the removal of existing cold mill equipment and replaced with new Inner Stand equipment, Manual Inspection equipment, Rotary Shear, Carousal Tension Reel and Walking Beam coil handling equipment, including all structural steel for both No. 6 Pickle Line and No. 2 TCM.
The objective of the projects was to increase No. 2 TCM`s productivity to 2.3 million short tons per year of high-end cold rolled automotive exposed products.

For more information about State Group Inc. and its contracting services, please call 800.558.2034 or email us at info@stategroup.com
 
 
 
           
  ABOUT STATE
Company Profile
What Our Clients Say About State
Our Commitment to Safety
Our Commitment to Quality
Purchasing Terms & Conditions
Affiliations & Awards
News
  CAPABILITIES
Civil
Electrical
High Voltage
Mechanical
HVAC
Communications

  MARKETS WE SERVE
Automotive
Steel/Metals
Power Generation
Oil and Gas
Mining
Mission Critical Facilities
Transportation and Infrastructure
Commercial/Institutional
Power/High Voltage
     CAREERS
CONTACT
LOCATIONS
CASE STUDIES