PROJECT DESCRIPTION:
The Hearn SS project was an expansion and update to an existing 115kV Hydro One Switchyard located in the Portlands area of Toronto, ON.
The State Group Inc. was responsible for all site works, piling, foundations, grounding, and underground services in addition to also being responsible for an elevated Design Build GIS Switchgear Building, and a Design Build Relay Building including of all base building Foundations, Electrical, HVAC, Mechanical, and process grounding.
Work was performed on an expedited schedule while working closely with the General Contractor to facilitate their just in time Engineering schedules. Work was further complicated by the required installation of over 600 helical piers that needed to avoid all existing underground structures in the existing yard while working under permit around live equipment.

For more information about State Group Inc. and its contracting services, please call 800.558.2034 or email us at info@stategroup.com
 
 
 
           
  ABOUT STATE
Company Profile
What Our Clients Say About State
Our Commitment to Safety
Our Commitment to Quality
Purchasing Terms & Conditions
Affiliations & Awards
News
  CAPABILITIES
Civil
Electrical
High Voltage
Mechanical
HVAC
Communications

  MARKETS WE SERVE
Automotive
Steel/Metals
Power Generation
Oil and Gas
Mining
Mission Critical Facilities
Transportation and Infrastructure
Commercial/Institutional
Power/High Voltage
     CAREERS
CONTACT
LOCATIONS
CASE STUDIES